Projects
Scroll to browse. Select a project to open it.

Hormuz Shore Walk
Bandar Abbas, Iran
A kilometre-long timber promenade lifted above the tide.
The Shore Walk raises a one-kilometre promenade above the tidal flats on slender piers, giving the city a new horizon line to walk along.
Under the walk, the mangrove nursery is restored; above it, shaded pavilions, benches and a fish market face the Strait.
- Length
- 1,050 m
- Material
- Thermo-ash decking, stainless fixings
- Coastal engineering
- Lund & Partners, Copenhagen
The walk follows the old shoreline, which the city had forgotten. Where the tide once reached, there are now benches; where fishermen landed, a market.
It is built in 24 prefabricated bays, each lifted into place in a single tide.

The promenade at mid-tide. “For the first time the city faces the water with its front, not its back.”
Municipal planner, Bandar Abbas 
At dusk the walk fills with families. 
Slatted deck: 18 mm gaps drain the spray. 
Promenade plan, 1:1000. The Strait
Bandar Abbas faces the Strait of Hormuz; the tidal range here is 3.4 m. The piers are designed for 50-year storm surge.
Coordinates27.1832° N, 56.2666° E
Credits
Design lead
- Omid Tavakoli
Landscape
- Green Atelier
- Studio Hanne Berg
Collaborators
- Lund & Partners






